PHASE 4: INSTALLATION



This phase typically takes 1 or more weeks depending on the scope of the project. Our design team and installation team will continue to work closely with the principals on site to ensure the install goes smoothly.


Appliances should be available to ensure proper fit, although appliance installation is not part of our contract. Plumbing fixtures are also a good idea to have on site, again just to make sure there are no surprises.


As soon as your cabinets are installed, your countertop fabricator can come and take the measurements they’ll need to shape the slabs for your project. At this stage, the final draw is due.


This phase usually takes 2 to 3 weeks from measurement to countertop installation. Keep in mind that you’ll be able to use your cabinets while you are waiting because NEFF permanently finishes the top of each cabinet with the wood substrate for stability and for better hygiene.